Maryland CBLP-Shorelines Workshop Materials

Agenda

Worksheets & Handouts

Printed copies of materials needed for class will be provided.

Videos

Pre-Class Assignments

Prior to Day 1

  • Review & be familiar with Key References:
    • Shore Erosion Control Guidelines: Marsh Creation & Waterfront Property Owners
    • Permitting Terms
    • Site Assessment Terms
    • MDSPGP-Category A criteria
  •  Watch the following videos:
      • Intro to CBLP
      • Living Shorelines 101

Prior to Day 2

Prior to Day 3

  • Watch the following videos:
    • Designing for Sea Level Rise
    • Planting Considerations for Living Shorelines
  • Review the following documents:
    • Common Maintenance Tasks
    •  Maryland JPA Instruction Manual
    • Critical Area Buffer Notification Form
    • Living Shoreline Waiver Request Form

Drawing & Permitting Exercise (Due by 5PM on Tuesday, October 14)

Full assignment details to be given in class. 

  • Using what you have learned throughout the workshop, refine the concept drawing begun in class and develop permit drawings for a living shoreline appropriate for the site discussed in class. Submit a pdf of the drawings to katie@cblpro.org by 5pm on Tuesday, October 14.
  • Complete a JPA Short form for the site design you develop. Submit along with the drawings.
  • Answer the following questions pertaining to your design:
      • How will your shoreline adapt to the intermediate high rate of sea level rise?
      • What is the expected life of your project?

Additional resources for drawings: CBLP Shorelines Drawing Assignment,  Sample Drawings, Base Map, existing conditionsProposed design area, with reference photos, Critical Area Buffer Notification Form, Living Shoreline Waiver Request Form,